|
C.D./DoF |
Code |
Cost |
ID |
Description |
|
|
$/K Low |
$/K Med |
||||
|
SR |
EL, LS |
4 |
10 |
EI |
Electric Service Upgrade (see strobe alarm & AC |
|
SR |
EL, LS |
3 |
5 |
E2 |
Electric Basement and 1st Floor wire upgrade, ground fault |
|
SR |
EL, PM |
2 |
3 |
E3 |
Electric grounding 2nd and 3rd floor, quantity of outlet/spacing study rooms, removal of abandoned boxes or extend |
|
SR |
UN |
4 |
4.5 |
E4 |
Lighting upgrade in study rooms and TV room with fans |
|
SR |
EL, LS, PM |
1.5 |
2 |
E5 |
Exterior building facade light/ underground wire |
|
SR |
EL, U |
1 |
1.5 |
E6 |
Exterior entry light/ night light switching or photocell |
|
MR |
EL, U |
0.5 |
2.5 |
E7 |
Lighting library, hall upgrade at 1st floor |
|
SR |
EL, LS |
0.25 |
0.3 |
E8 |
Lighting upgrade in storage closets 2nd / 3rd floor |
|
SR |
LS |
7 |
7.5 |
A1 |
Alarm, fire replacement panel zoning related UL wire upgrade loop 2 wire |
|
MR |
U |
0.5 |
1 |
A2 |
Expand burglar alarm coverage |
|
SR |
LS |
0.7 |
1.75 |
A3 |
Add fire alarm sensors/ extend coverage and sump sensor replace damaged outdated sensors/ strobes (see E1) |
|
I/SR |
PM |
2.5 |
3.5 |
CS1 |
Upgrade drain tiles: dining room. chapter room, ritual room/ area drains floods the basement see gutters and door repair |
|
SR |
P, PM, LS |
0.4 |
0.5 |
CS2 |
Emergency sump pump backup and outlets |
|
SR |
PM |
0.2 |
0.25 |
CS3 |
Parking lot/ drive way drainage flooding/ damage |
|
SR |
PM |
0.5 |
0.75 |
CS4 |
Window wells have settled, voids, sinking concrete site retention |
|
SR |
PM, S |
4.5 |
5 |
CS5 |
Site drainage/ landscape plant beds, drive retaining wall and brick terraces/ east/ north concrete terrace settlement |
|
SR |
PM |
1.75 |
2 |
CS6 |
Lower limestone terrace, limestone steps/ railing settlement/ walking surface/ perimeter drainage |
|
SR |
PM, S |
3.5 |
4.5 |
CS7 |
Repave parking lot/ drive way; flow/slope |
|
SR |
PM, S |
15 |
25 |
EM1 |
Exterior tuck point, wall/ ledges |
|
SR |
PM, S |
4 |
5 |
EM2 |
Foundation failure interior/ exterior/ window sills |
|
SR |
PM, S |
4 |
5 |
EM3 |
Tuck point limestone, entry/ belt coarses |
|
SR |
PM, S |
15 |
25 |
EM4 |
Tuck point limestone 3 chimneys/ caps |
|
I/SR |
PM, S |
2 |
2.5 |
EM5 |
Flashing: tower brick/ cricket to roof |
|
SR |
PM, S |
6 |
10 |
EM6 |
3 chimney cricket flashing/ anchorage |
|
I/SR |
PM, S |
3 |
10 |
EM7 |
North wall rebuild vs. repair |
|
SR |
PM, S |
1 |
5 |
EM8 |
Rebuild entry limestone and keystone |
|
SR |
PM, S |
0.5 |
5 |
EM9 |
Area way north wall, railing/ concrete see CS5 |
|
SR |
PM, S |
0.5 |
5 |
EM10 |
Iron balcony anchorage to limestone |
|
SR |
PM, S |
0.5 |
5 |
EM11 |
Replace iron balcony balustrade, anchorage to roof, prime/ paint (Future roof membrane) and weather vane base anchorage |
|
I/SR |
PM, S |
9 |
11 |
EM12 |
Repair roof membrane eaves/ field phase 1 (E) active leaks |
|
SR |
PM, S |
10 |
15 |
EM13 |
Repair roof membrane eaves/ field phase 2 (W) |
|
SR |
PM, S |
5 |
8 |
EM14 |
Repair roof membrane eaves/ field phase 3 (S) |
|
I/SR |
PM, S |
5 |
11 |
EM15 |
Flat roofs standing seam, eyebrows, active leaks |
|
LR |
PM, S |
200 |
225 |
EM16 |
Roof clay tile replacement |
|
SR |
PM, S |
1 |
1.5 |
EM17 |
Attic/ tower roof vent/ roof flashing/ cap |
|
SR |
PM, S |
12 |
20 |
EM18 |
Gutters/ downspouts |
|
SR |
PM, S |
0.5 |
1 |
EM19 |
Subsoil drainage/ clean-outs |
|
SR |
PM, S |
0.3 |
0.75 |
EM20 |
Caulking, threshold/ patio doors, glazing |
|
I/SR |
PM, S |
0.3 |
2 |
EM21 |
Wood damage replacement, fascia |
|
I/SR |
PM, S |
5 |
7 |
EM22 |
Painting West (entry) facade |
|
SR |
PM |
6 |
8 |
EM23 |
Painting East (rear )and south facade/ weather stripping |
|
SR |
PM |
4 |
6 |
EM24 |
Painting North/ weather stripping |
|
SR |
PM, E |
0.75 |
1.5 |
EM25 |
Window repair minimum - handles, hinge/ round tops/ reglazing |
|
I/SR |
PL |
8 |
15 |
PL1 |
New domestic water- services (see sprinkler) |
|
MR |
PL |
7 |
10 |
PL2 |
New domestic water- feed, riser, recalculating pump |
|
SR |
PL, PM |
30 |
50 |
PL3 |
New men's bathroom shower upgrade |
|
I/SR |
PL, PM |
1.75 |
3 |
PL4 |
Men's toilet- Plumbing/ ventilation upgrade |
|
I/SR |
PL, PM |
5 |
8 |
PL5 |
Hot water heaters- domestic |
|
SR |
PL, HC |
1.5 |
2.5 |
PL6 |
Hot water heaters- kitchen boosters and disposals |
|
I/SR |
PL, HC |
0.75 |
1.5 |
PL7 |
Drinking fountain/ hose bib anti siphon |
|
I/SR |
PL, PM |
5 |
8 |
PL8 |
Hot water reservoir/ related work |
|
SR |
PL, HC |
2 |
3 |
PL9 |
Grease trap repair |
|
SR |
PL, LS |
18 |
25 |
M1 |
Kitchen exhaust hood, ansul/ fan |
|
SR |
PL, H |
8 |
12 |
M2 |
Dishwasher N.S.F. |
|
MR |
PL, LS |
1.5 |
1 |
M3 |
Ash pits cover, flue damper chimneys |
|
MR |
H |
80 |
125 |
H1 |
Heating distribution, controls replacement (See future A/C) |
|
I/SR |
H |
2 |
3 |
H2 |
Heating convector bleeder values/ cleaning |
|
MR |
H |
2 |
3 |
H3 |
Heating convector zoning upper study rooms #8-11 register or control valve balance |
|
I/SR |
LS,S |
0.75 |
1 |
LS1 |
Roof valley structure failure/ lounge beam splice |
|
I/SR |
LS |
4 |
5 |
LS2 |
Plumbing chase fire stop/ fire caulk/ escutcheon - 2nd floor/ 3rd floor |
|
I/SR |
LS |
5 |
8 |
LS3 |
Plumbing chase fire door access panels, attic drop stair hatch fire doors |
|
SR |
LS |
3 |
5 |
LS4 |
Study room door upgrade- phase I |
|
LR |
LS |
3 |
5 |
LS5 |
Study room door upgrade- phase II |
|
SR |
LS |
23 |
25 |
LS6 |
Fire suppression and Siamese - service entry (see strobe/ domestic water) |
|
SR |
LS |
18 |
20 |
LS7 |
Fire suppression/ current code basement pantry and storage/ 1st floor and storage |
|
SR/MR |
LS |
40 |
50 |
LS8 |
Fire suppression/ Future code (see floor fire blocking/ draft |
|
I/SR |
LS |
5 |
8 |
LS9 |
Fire caulk/ stops at halls and pipes/ wires |
|
I/SR |
LS |
0.5 |
1.5 |
LS10 |
Fire caulk/ stops at computer room 13/ basement |
|
I/SR |
PM |
1.5 |
2 |
|
Study room plaster (L) repair |
|
I/SR |
PM |
1.5 |
2 |
|
Study room closet plaster (L) repair |
|
I/SR |
PM |
1.5 |
2 |
|
Study room closet shelving/ hanger rod |
|
I/SR |
PM |
1.5 |
2 |
|
Study room floors refinishing |
|
SR |
PM |
0.5 |
0.75 |
|
Study room deficiencies room 12 |
|
SR |
HC |
1.5 |
1.75 |
|
Kitchen repair/ paint at walls at concrete block |
|
SR |
HC,PM |
0.5 |
0.75 |
|
Kitchen repair/ paint at walls at plaster failure/ trim upgrade |
|
SR |
U |
1 |
1.5 |
|
Study room storms screens/ hardware |
|
I/SR |
HC,PM |
0.5 |
0.75 |
|
Commons area/ kitchen storms/ screens |
|
MR |
U |
5 |
6 |
|
Crawl space at 3rd floor to roof 2.5" batt wall insulation exteriors #2-5 |